TRANSMITTER,PRESS,SIZE PG379,A182F11
Material 4100055694 · TRANSMITTER · Plant 1000
AReduceNon-moving
- Material
- 4100055694
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (7 of 10 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~74 days; expected demand during lead time 0.0.
- 3.A 99.3% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 5 exceeds the level to keep (1) by 4.
- 5.Installed on 10 FuncLoc(s), 7 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.3%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 27.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 10 functional locations
7 with criticality A/B · 13 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-129 METHANOL FLOW | A | 1 | 0 | 0.04 |
| PX_FIT-257 FLOW | A | 1 | 0 | 0.04 |
| PX_PIT-1100C PRESSURE | A | 1 | 0 | 0.04 |
| PX_DPT-609 DIFF. PRESSURE | B | 2 | 1 | 0.06 |
| PX_TIT-1251A TEMPERATURE | B | 1 | 1 | 0.04 |
| PX_FIT-1757 PP-1891B INLET FLOW | B | 1 | 0 | 0.04 |
| PX_FIT-738 FLOW | B | 3 | 0 | 0.04 |
| PX_FIT-1696 FLOW | C | 1 | 1 | 0.47 |
| PX_LIT-139B CL-1744 LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-912-22B PP-645A LEVEL | S | 1 | 0 | 0.03 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Jun 2025 | Medium | PX_DPT-609 | Install scaffolding at DPT-609 |
| 13 Jun 2025 | Medium | PX_FIT-1696 | Install cover plate for MCP cracking |
| 02 May 2025 | Low | PX_TIT-1251A | Check TIT-1251A.ok |
Recent goods issues
Never issued in the 17-month history.