TRANSMITTER,PRESS,TYPE LF716,CS

Material 4100055698 · TRANSMITTER · Plant 1000

CReduceSlow-moving
Material
4100055698
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
RAJAWALI SEJAHTERA ABADI PT
Lead time
88 d · P80 126 d
Unit price
Rp 40.8M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~88 days; expected demand during lead time 0.1.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 40 exceeds the level to keep (0) by 40.
Convert to Non StockSingle sourceOpen PO
On hand / on order
40 / 1
next delivery 28 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 40.8M
PO history
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 239 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1662
LEVEL
C110.03
PX_LIT-139B
CL-1744 LEVEL
C100.03
PX_TIT-1722B
VD-1730 TEMPERATURE
S100.04

Lead time and procurement

Lead time 88 ± 45 days (PO history + category, 1 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
20 Jun 2026PR05
Project / turnaround
1Rp 40.8M28 Oct 2026
open
130 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_LIT-1662Install scaffolding at LIT-1662

Recent goods issues

Posting dateQtyOrderOrder type
04 Feb 20262201000017185Corrective