TRANSMITTER,PRESS,TYPE TC96,GRAPHITE
Material 4100055717 · TRANSMITTER · Plant 1000
AReorderCriticalStockout
- Material
- 4100055717
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 4 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 70 d · P80 88 d
- Unit price
- Rp 71.6M
Recommendation
- 1.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~70 days; expected demand during lead time 0.9.
- 3.A 97.3% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
- 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 572.9M · order by 01 Oct 2026
Expected arrival ≈ 70 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
97.3%
stockout risk now 22%
Unit price
Rp 71.6M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 65 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 4 functional locations
1 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1707A PRESSURE | A | 1 | 0 | 0.04 |
| PX_FIT-1918A-48 FLOW | C | 1 | 0 | 0.04 |
| PX_LIT-1726 PP-387 LEVEL | C | 1 | 0 | 0.03 |
| PX_PIT-841 HE-846B PRESSURE | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 70 ± 40 days (PO history, 3 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Apr 2026 | PR03 Regular replenishment | 2 | Rp 73.3M | 14 Jul 2026 | 98 d |
| 24 Mar 2026 | PR03 Regular replenishment | 4 | Rp 70.6M | 05 Jun 2026 | 73 d |
| 01 Nov 2025 | PR03 Regular replenishment | 2 | Rp 71.6M | 29 Nov 2025 | 28 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Jul 2026 | 2 | 201000017737 | Corrective |
| 28 Jul 2026 | 4 | 201000017737 | Corrective |
| 27 Jul 2026 | 1 | 201000017737 | Corrective |