TRANSMITTER,PRESS,TYPE TC96,GRAPHITE

Material 4100055717 · TRANSMITTER · Plant 1000

AReorderCriticalStockout
Material
4100055717
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
70 d · P80 88 d
Unit price
Rp 71.6M

Recommendation

  • 1.Forecast 4.6 EA/year: 4.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~70 days; expected demand during lead time 0.9.
  • 3.A 97.3% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 572.9M · order by 01 Oct 2026
Expected arrival ≈ 70 days
Single source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
8
order qty 4
Service level
97.3%
stockout risk now 22%
Unit price
Rp 71.6M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 65 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1707A
PRESSURE
A100.04
PX_FIT-1918A-48
FLOW
C100.04
PX_LIT-1726
PP-387 LEVEL
C100.03
PX_PIT-841
HE-846B PRESSURE
C100.04

Lead time and procurement

Lead time 70 ± 40 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
07 Apr 2026PR03
Regular replenishment
2Rp 73.3M14 Jul 202698 d
24 Mar 2026PR03
Regular replenishment
4Rp 70.6M05 Jun 202673 d
01 Nov 2025PR03
Regular replenishment
2Rp 71.6M29 Nov 202528 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
28 Jul 20262201000017737Corrective
28 Jul 20264201000017737Corrective
27 Jul 20261201000017737Corrective