TRANSMITTER,PRESS,TYPE KO80,CS

Material 4100056180 · TRANSMITTER · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100056180
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
79 d · P80 126 d
Unit price
Rp 34.1M

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~79 days; expected demand during lead time 0.1.
  • 3.A 97.2% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle source
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.2%
stockout risk now 3%
Unit price
Rp 34.1M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 416 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 104.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1842
FLOW
A100.04
PX_PIT-1657
PRESSURE
A100.04

Lead time and procurement

Lead time 79 ± 45 days (PO history + category, 1 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
02 Sept 2025PR06
Regular replenishment
1Rp 34.1M04 Dec 202593 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
11 Aug 20252201000018913Corrective