TRANSMITTER,PRESS,SIZE OE23,VITON

Material 4100056270 · TRANSMITTER · Plant 1000

BReduceNon-moving
Material
4100056270
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
B (2 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.0.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 13 exceeds the level to keep (1) by 12.
  • 5.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
13 / 0
no open PO
Today Min / Max
3 / 7
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
98.8%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 11.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 4 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1304-33
PP-818B DP
B120.49
PX_PIT-1409-44B
METHANOL PRESSURE
B100.04
PX_PIT-794A
HE-1434A PRESSURE
C120.90
PX_LIT-475
PP-1665 LEVEL
C100.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
16 Jul 2026MediumPX_PIT-794AInstall cover plate for MCP cracking
08 Jul 2026LowPX_DPT-1304-33DPT-1304-33 error
25 Jun 2025MediumPX_PIT-794AAR25/tranmsitter low performance
18 May 2025MediumPX_DPT-1304-33PSM25/Repair insulation DPT-1304-33

Recent goods issues

Never issued in the 17-month history.