Sparely
DU

TRANSMITTER,PRESS,TYPE XY973,SS316

Material 4100056376 · TRANSMITTER · Plant 1000

ALong-leadMonitorHealthy
Material
4100056376
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
96 d · P80 127 d
Unit price
Rp 22.0M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~96 days; expected demand during lead time 0.4.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Long lead time: 80% of deliveries took up to 127 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
3 / 1
next delivery 17 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.0%
stockout risk now 1%
Unit price
Rp 22.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 434.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1155
PRESSURE
A100.04

Lead time and procurement

Lead time 96 ± 29 days (PO history, 4 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
13 Jul 2026PR03
Regular replenishment
1Rp 21.8M17 Nov 2026
open
127 d
02 Jan 2026PR06
Regular replenishment
1Rp 22.2M16 Apr 2026104 d
11 Nov 2025PR03
Regular replenishment
2Rp 22.3M19 Mar 2026128 d
01 Jul 2025PR03
Regular replenishment
2Rp 21.7M01 Oct 202592 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20263201000020250Corrective