TRANSMITTER,PRESS,TYPE OL864,SS304

Material 4100056485 · TRANSMITTER · Plant 1000

CReduceSlow-moving
Material
4100056485
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
59 d · P80 69 d
Unit price
Rp 69.5M

Recommendation

  • 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~59 days; expected demand during lead time 0.3.
  • 3.A 81.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 12 exceeds the level to keep (2) by 10.
Single sourceOpen PO
On hand / on order
12 / 1
next delivery 13 Oct 2026
Today Min / Max
5 / 14
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
81.7%
stockout risk now 0%
Unit price
Rp 69.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 20.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-1313
HE-1810B LEVEL
C140.89

Lead time and procurement

Lead time 59 ± 29 days (PO history, 9 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
08 Jul 2026PR06
Regular replenishment
1Rp 66.7M13 Oct 2026
open
97 d
14 Mar 2026PR03
Regular replenishment
1Rp 69.5M13 Apr 202630 d
08 Feb 2026PR06
Regular replenishment
2Rp 68.4M18 Mar 202638 d
18 Jan 2026PR06
Regular replenishment
2Rp 69.9M07 Apr 202679 d
01 Oct 2025PR06
Regular replenishment
2Rp 67.9M24 Oct 202523 d
17 Aug 2025PR03
Regular replenishment
2Rp 69.0M14 Oct 202558 d
13 Aug 2025PR03
Regular replenishment
2Rp 70.0M27 Sept 202545 d
06 Jul 2025PR03
Regular replenishment
2Rp 72.2M01 Sept 202557 d
01 Jul 2025PR06
Regular replenishment
2Rp 69.5M01 Sept 202562 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
29 Jul 2026MediumPX_LIT-1313Check LIT-1313.ok
15 Dec 2025LowPX_LIT-1313Leak from packing
03 Sept 2025MediumPX_LIT-1313Install scaffolding at LIT-1313
21 May 2025LowPX_LIT-1313Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
02 Jan 20261201000017002Corrective
11 Sept 20251201000014582Corrective
10 Sept 20252201000014582Corrective
09 Sept 20251201000014582Corrective