TRANSMITTER,PRESS,TYPE OL864,SS304
Material 4100056485 · TRANSMITTER · Plant 1000
CReduceSlow-moving
- Material
- 4100056485
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 59 d · P80 69 d
- Unit price
- Rp 69.5M
Recommendation
- 1.Forecast 1.6 EA/year: 1.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~59 days; expected demand during lead time 0.3.
- 3.A 81.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 12 exceeds the level to keep (2) by 10.
Single sourceOpen PO
On hand / on order
12 / 1
next delivery 13 Oct 2026
Today Min / Max
5 / 14
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
81.7%
stockout risk now 0%
Unit price
Rp 69.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 20.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-1313 HE-1810B LEVEL | C | 1 | 4 | 0.89 |
Lead time and procurement
Lead time 59 ± 29 days (PO history, 9 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 08 Jul 2026 | PR06 Regular replenishment | 1 | Rp 66.7M | 13 Oct 2026 open | 97 d |
| 14 Mar 2026 | PR03 Regular replenishment | 1 | Rp 69.5M | 13 Apr 2026 | 30 d |
| 08 Feb 2026 | PR06 Regular replenishment | 2 | Rp 68.4M | 18 Mar 2026 | 38 d |
| 18 Jan 2026 | PR06 Regular replenishment | 2 | Rp 69.9M | 07 Apr 2026 | 79 d |
| 01 Oct 2025 | PR06 Regular replenishment | 2 | Rp 67.9M | 24 Oct 2025 | 23 d |
| 17 Aug 2025 | PR03 Regular replenishment | 2 | Rp 69.0M | 14 Oct 2025 | 58 d |
| 13 Aug 2025 | PR03 Regular replenishment | 2 | Rp 70.0M | 27 Sept 2025 | 45 d |
| 06 Jul 2025 | PR03 Regular replenishment | 2 | Rp 72.2M | 01 Sept 2025 | 57 d |
| 01 Jul 2025 | PR06 Regular replenishment | 2 | Rp 69.5M | 01 Sept 2025 | 62 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Jul 2026 | Medium | PX_LIT-1313 | Check LIT-1313.ok |
| 15 Dec 2025 | Low | PX_LIT-1313 | Leak from packing |
| 03 Sept 2025 | Medium | PX_LIT-1313 | Install scaffolding at LIT-1313 |
| 21 May 2025 | Low | PX_LIT-1313 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 02 Jan 2026 | 1 | 201000017002 | Corrective |
| 11 Sept 2025 | 1 | 201000014582 | Corrective |
| 10 Sept 2025 | 2 | 201000014582 | Corrective |
| 09 Sept 2025 | 1 | 201000014582 | Corrective |