Sparely
DU

TRANSMITTER,PRESS,TYPE JL186,NBR

Material 4100056497 · TRANSMITTER · Plant 1000

AMonitorSlow-moving
Material
4100056497
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 1.0 EA/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.2.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.5%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 483 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 384.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1959A
HE-810A INLET FLOW
A120.47
PX_FIT-1463-25A
GASOLINE FLOW
B120.47
PY_FIT-772
HE-528A INLET FLOW
S110.47

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jun 2026LowPX_FIT-1463-25AReplace lamp as per PM finding
08 May 2026MediumPX_FIT-1959AFIT-1959A reading frozen
18 Jun 2025LowPY_FIT-772Replace lamp as per PM finding
05 Jun 2025LowPX_FIT-1463-25AInstall scaffolding at FIT-1463-25A
31 May 2025MediumPX_FIT-1959AFIT-1959A abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
05 Jun 20252201000026447Corrective