TRANSMITTER,PRESS,MODEL ZO828,NBR

Material 4100056789 · TRANSMITTER · Plant 1000

CReduceExcess
Material
4100056789
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
72 d · P80 126 d
Unit price
Rp 25.0M

Recommendation

  • 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~72 days; expected demand during lead time 0.1.
  • 3.A 90.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Stock 4 exceeds the level to keep (1) by 3.
Single source
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
90.6%
stockout risk now 0%
Unit price
Rp 25.0M
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 35 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 8.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-310B
LEVEL
C100.03
PX_FIT-1921A
PP-1862 INLET FLOW
S100.04

Lead time and procurement

Lead time 72 ± 45 days (PO history + category, 2 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
03 Feb 2026PR03
Regular replenishment
2Rp 24.7M01 May 202687 d
01 Dec 2025PR03
Regular replenishment
1Rp 25.2M22 Jan 202652 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
27 Aug 20261201000024605Corrective