TRANSMITTER,DIFF.PRESS,0~5000MMH2O,HART
Material 4100057194 · TRANSMITTER · Plant 1000
ALong-leadMonitorStockout
- Material
- 4100057194
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (22 of 62 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 95 d · P80 143 d
- Unit price
- Rp 39.5M
Recommendation
- 1.Forecast 15 EA/year: 15 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~95 days; expected demand during lead time 3.9.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 15.
- 4.Long lead time: 80% of deliveries took up to 143 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 62 FuncLoc(s), 22 of them criticality A/B.
- 6.ML early warning: 92% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceAbnormal consumptionOpen POSame description as 5 other material numbers
On hand / on order
0 / 27
next delivery 25 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 9
Rec. Max
15
order qty 3
Service level
99.8%
stockout risk now 0%
Unit price
Rp 39.5M
PO history
ML early warning: 92% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 48 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 7 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 17 issue days · 1 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 62 functional locations
22 with criticality A/B · 76 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_DPT-956-2A DIFF. PRESSURE | A | 1 | 4 | 1.35 |
| PX_PIT-1063-22B PRESSURE | A | 2 | 4 | 0.90 |
| PX_FIT-1974B FLOW | A | 1 | 2 | 0.47 |
| PY_PIT-578A CL-1481 PRESSURE | A | 1 | 2 | 0.47 |
| PX_FIT-921B FLUSHING OIL FLOW | A | 4 | 0 | 0.04 |
| PX_PIT-1100C PRESSURE | A | 1 | 0 | 0.04 |
| PX_PIT-1657 PRESSURE | A | 1 | 0 | 0.04 |
| PX_PIT-1707A PRESSURE | A | 1 | 0 | 0.04 |
| PX_PIT-644 REFLUX PRESSURE | A | 1 | 0 | 0.04 |
| PX_TIT-199 CL-658 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_TIT-829-55 VD-609 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_LIT-999A-15A LEVEL | B | 1 | 1 | 0.46 |
Lead time and procurement
Lead time 95 ± 57 days (PO history, 13 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 Sept 2026 | PR06 Regular replenishment | 14 | Rp 38.6M | 25 Oct 2026 open | 43 d |
| 30 Aug 2026 | PR05 Project / turnaround | 7 | Rp 40.0M | 30 Jan 2027 open | 153 d |
| 16 Jul 2026 | PR06 Regular replenishment | 7 | Rp 38.7M | 07 Sept 2026 | 53 d |
| 02 Jul 2026 | PR06 Regular replenishment | 9 | Rp 39.2M | 14 Sept 2026 | 74 d |
| 12 Jun 2026 | PR06 Regular replenishment | 6 | Rp 39.5M | 31 Aug 2026 | 80 d |
| 27 Apr 2026 | PR03 Regular replenishment | 6 | Rp 40.3M | 10 Nov 2026 open | 197 d |
| 10 Apr 2026 | PR05 Project / turnaround | 5 | Rp 40.4M | 15 Aug 2026 | 127 d |
| 24 Nov 2025 | PR06 Regular replenishment | 7 | Rp 39.7M | 12 Feb 2026 | 80 d |
| 06 Nov 2025 | PR03 Regular replenishment | 11 | Rp 41.1M | 12 Jan 2026 | 67 d |
| 16 Oct 2025 | PR06 Regular replenishment | 15 | Rp 38.3M | 29 Nov 2025 | 44 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Aug 2026 | Low | PX_DPT-956-2A | DPT-956-2A abnormal indication |
| 08 Aug 2026 | High | PX_FIT-140 | FIT-140 error |
| 17 Jun 2026 | Medium | PX_DPT-956-2A | Leak from packing |
| 06 Jun 2026 | Low | PY_PIT-578A | Replace lamp as per PM finding |
| 20 May 2026 | Medium | PX_PIT-578A | AR25/tranmsitter low performance |
| 14 Apr 2026 | Low | PX_PIT-1063-22B | Painting PIT-1063-22B |
| 02 Apr 2026 | Medium | PX_PIT-1063-22B | AR25/tranmsitter low performance |
| 29 Mar 2026 | Emergency | PX_FIT-686A | [MSI-B-26-YLM-221] Permanent repair |
| 06 Mar 2026 | Medium | PX_FIT-1974B | Check FIT-1974B.ok |
| 24 Feb 2026 | Medium | PX_PIT-578A | Install scaffolding at PIT-578A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Aug 2026 | 1 | 201000011252 | Corrective |
| 20 Jun 2026 | 2 | 201000020155 | Corrective |
| 19 Jun 2026 | 3 | 201000024332 | Corrective |
| 03 Jun 2026 | 1 | 201000012166 | Corrective |
| 07 May 2026 | 1 | 204000003804 | Preventive |
| 12 Mar 2026 | 1 | 201000023690 | Corrective |
| 31 Jan 2026 | 1 | 201000001793 | Corrective |
| 13 Jan 2026 | 1 | 201000039896 | Corrective |
| 15 Dec 2025 | 3 | 201000036707 | Corrective |
| 02 Dec 2025 | 1 | 201000008858 | Corrective |
| 01 Dec 2025 | 1 | 201000008858 | Corrective |
| 17 Oct 2025 | 2 | 201000009960 | Corrective |
| 09 Aug 2025 | 1 | 201000004846 | Corrective |
| 15 Jul 2025 | 1 | 201000019096 | Corrective |
| 03 Jul 2025 | 9 | 201000031242 | Corrective |