TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF

Material 4100057225 · TRANSMITTER · Plant 1000

ALong-leadMonitorHealthy
Material
4100057225
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 17 FuncLocs A/B)
Supplier
GUNUNG PERKASA NUSANTARA PT
Lead time
72 d · P80 126 d
Unit price
Rp 49.1M

Recommendation

  • 1.Forecast 6.8 EA/year: 6.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~72 days; expected demand during lead time 1.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 10.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 17 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 35% probability of demand in the next 90 days.
Long-leadML early warningSingle sourceSame description as 9 other material numbers
On hand / on order
8 / 0
no open PO
Today Min / Max
2 / 4
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
10
order qty 3
Service level
99.6%
stockout risk now 0%
Unit price
Rp 49.1M
PO history
ML early warning: 35% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 68 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 17 functional locations

8 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-956-2A
DIFF. PRESSURE
A141.35
PX_TIT-1827-22B
HE-1437C TEMPERATURE
A140.90
PX_FIT-1311-50A
FLOW
A100.04
PX_LIT-1164
PP-1945D LEVEL
A300.03
PX_TIT-614D
TEMPERATURE
A100.04
PX_TIT-616
HE-528A TEMPERATURE
A100.04
PX_TIT-707
TEMPERATURE
B110.04
PX_TIT-1003
TEMPERATURE
B100.04
PX_PIT-794A
HE-1434A PRESSURE
C120.90
PX_TIT-1681B
TEMPERATURE
C120.47
PX_FIT-148A
C3 RECYCLE FLOW
C100.04
PX_LIT-1403
LEVEL
C100.03

Lead time and procurement

Lead time 72 ± 45 days (PO history + category, 2 PO lines) · on-time 35%

PR dateTypeQtyUnit priceDeliveryLead time
07 Apr 2026PR06
Regular replenishment
4Rp 48.7M02 Jul 202686 d
30 Jul 2025PR03
Regular replenishment
5Rp 49.5M20 Sept 202552 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026MediumPX_TIT-1681BPainting TIT-1681B
21 Aug 2026LowPX_DPT-956-2ADPT-956-2A abnormal indication
16 Jul 2026MediumPX_PIT-794AInstall cover plate for MCP cracking
07 Jul 2026LowPX_TIT-1827-22BInstall scaffolding at TIT-1827-22B
17 Jun 2026MediumPX_DPT-956-2ALeak from packing
24 Nov 2025MediumPX_TIT-1827-22B[MSI-B-25-ZCD-108] Permanent repair
02 Nov 2025LowPX_TIT-1827-22BTIT-1827-22B abnormal indication
17 Aug 2025LowPX_DPT-956-2AAR25/tranmsitter low performance
08 Aug 2025MediumPX_TIT-1681BAR25/tranmsitter low performance
25 Jun 2025MediumPX_PIT-794AAR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
25 Jul 20262201000029643Corrective
12 Jul 20261205000005774Other maintenance
09 Dec 20252201000019351Corrective
09 Dec 20251201000019351Corrective
02 Aug 20251201000006771Corrective
02 Aug 20252201000006771Corrective
01 Aug 20252201000006771Corrective