TRANSMITTER,DIFF.PRESS,0~2500MMH2O,HART

Material 4100057259 · TRANSMITTER · Plant 1000

ALong-leadTransferNormalBelow reorder point
Material
4100057259
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (8 of 17 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
101 d · P80 162 d
Unit price
Rp 78.1M

Recommendation

  • 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~101 days; expected demand during lead time 0.7.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 4.
  • 4.On hand 1 + on order 2 is at or below the reorder point: 1 needed.
  • 5.Long lead time: 80% of deliveries took up to 162 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 17 FuncLoc(s), 8 of them criticality A/B.
  • 7.Identical part 4100058397 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Long-leadSingle sourceOpen POSame description as 2 other material numbers
On hand / on order
1 / 2
next delivery 01 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
4
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 78.1M
PO history
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 114 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 17 functional locations

8 with criticality A/B · 25 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1959A
HE-810A INLET FLOW
A420.47
PX_FIT-278
FLOW
A110.47
PX_FIT-600-3B
PP-287D INLET FLOW
A110.04
PX_FIT-1939-27B
QUENCH OIL FLOW
A100.04
PX_DPT-524
PP-1597B DP
B120.06
PX_TIT-1989D-44A
PP-610B TEMPERATURE
B120.90
PX_LIT-1132-25A
VD-123A LEVEL
B200.03
PX_PIT-1900-33
VD-1840 PRESSURE
B100.04
PX_DPT-1189-33B
PP-251A DP
C310.06
PX_FIT-1696
FLOW
C110.47
PX_LIT-574
LEVEL
C200.03
PX_PIT-1225-37
VD-749A PRESSURE
C100.04

Lead time and procurement

Lead time 101 ± 50 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2026PR03
Regular replenishment
2Rp 78.1M01 Oct 2026
open
69 d
11 Dec 2025PR03
Regular replenishment
2Rp 74.8M27 Apr 2026137 d
10 Sept 2025PR06
Regular replenishment
2Rp 80.0M07 Mar 2026178 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Jun 2026MediumPX_FIT-1027-48FIT-1027-48 error
24 May 2026MediumPX_TIT-1989D-44AReplace lamp as per PM finding
08 May 2026MediumPX_FIT-1959AFIT-1959A reading frozen
23 Apr 2026MediumPX_DPT-386Replace lamp as per PM finding
11 Sept 2025MediumPX_DPT-386[MSI-B-25-DXF-173/M] Replace line
06 Sept 2025LowPX_DPT-524Install scaffolding at DPT-524
23 Jul 2025MediumPX_TIT-1989D-44APSM25/AR25/tranmsitter low performance
04 Jul 2025MediumPX_FIT-1027-48Replace lamp as per PM finding
25 Jun 2025LowPX_FIT-278Check FIT-278.ok
13 Jun 2025MediumPX_FIT-1696Install cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
09 Jun 20261201000006846Corrective
08 Jun 20261201000006846Corrective
06 Jul 20251201000018050Corrective
05 Jun 20251201000027238Corrective