TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF

Material 4100057267 · TRANSMITTER · Plant 1000

AReduceSlow-moving
Material
4100057267
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.1.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 3 exceeds the level to keep (2) by 1.
  • 5.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Price estimatedLead time estimatedSame description as 8 other material numbers
On hand / on order
3 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 18% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 276 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 347.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 10 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-648A
LEVEL
A200.03
PX_TIT-1655
VD-278A TEMPERATURE
A100.04
PX_FIT-1719
FLOW
B100.04
PX_PIT-1900-33
VD-1840 PRESSURE
B100.04
PX_PIT-742A
DEMIN WATER PRESSURE
B100.04
PX_PIT-893B
SEAL OIL PRESSURE
C110.47
PX_DPT-1770B
HE-314B DP
C100.06
PX_DPT-485
PP-1892B DP
C100.06
PX_DPT-1429
PP-915A DP
S100.06
PX_LIT-1191
LEVEL
S100.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Jul 2025MediumPX_PIT-893BPIT-893B abnormal indication

Recent goods issues

Posting dateQtyOrderOrder type
29 Dec 20251201000005230Corrective