TRANSMITTER,DIFF.PRESS,0~2500MMH2O,HART

Material 4100057333 · TRANSMITTER · Plant 1000

ALong-leadTransferCriticalStockout
Material
4100057333
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 7 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
81 d · P80 126 d
Unit price
Rp 88.4M

Recommendation

  • 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~81 days; expected demand during lead time 0.4.
  • 3.A 99.2% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 2 is at or below the reorder point: 1 needed.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 7 FuncLoc(s), 4 of them criticality A/B.
  • 7.Identical part 4100058397 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Long-leadConvert to Stock ItemSingle sourceOpen POSame description as 2 other material numbers
On hand / on order
0 / 2
next delivery 26 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.2%
stockout risk now 1%
Unit price
Rp 88.4M
PO history
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 90 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 7 functional locations

4 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_LIT-385
HE-1671A LEVEL
A120.46
PX_LIT-722
HE-1660A LEVEL
A110.03
PX_FIT-774B
WASH WATER FLOW
A200.04
PX_PIT-564C
PRESSURE
B100.04
PX_DPT-724
HE-462C DP
C100.06
PX_PIT-1689A-21A
PRESSURE
C100.04
PX_TIT-826A
HE-1900C TEMPERATURE
C100.04

Lead time and procurement

Lead time 81 ± 45 days (PO history + category, 2 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR06
Regular replenishment
2Rp 88.6M26 Dec 2026
open
108 d
09 Mar 2026PR10
Other
1Rp 88.2M24 May 202676 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Nov 2025HighPX_LIT-385Check LIT-385.ok
29 May 2025MediumPX_LIT-722AR25/tranmsitter low performance
23 May 2025MediumPX_LIT-385Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
03 Jul 20261201000009511Corrective
18 Jun 20261201000018305Corrective
06 Dec 20251205000030097Other maintenance