TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF

Material 4100057408 · TRANSMITTER · Plant 1000

AMonitorInsurance gap
Material
4100057408
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.0.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
99.8%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 6.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

2 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1407A
C3 RECYCLE FLOW
A300.04
PX_TIT-256A
TEMPERATURE
B110.04
PX_PIT-1033-1
HE-149A PRESSURE
C110.04
PX_LIT-1726
PP-387 LEVEL
C100.03
PX_LIT-443D-46
KC-899B LEVEL
S100.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 May 2025MediumPX_PIT-1033-1PIT-1033-1 reading frozen
08 May 2025MediumPX_TIT-256AInstall scaffolding at TIT-256A

Recent goods issues

Never issued in the 17-month history.