TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART

Material 4100057462 · TRANSMITTER · Plant 1000

ALong-leadTransferCriticalStockout
Material
4100057462
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
MEGA TEKNIK MAKMUR PT
Lead time
134 d · P80 126 d
Unit price
Rp 86.2M

Recommendation

  • 1.Forecast 3.6 EA/year: 3.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~134 days; expected demand during lead time 1.3.
  • 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 7 needed.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
  • 7.Identical part 4100057472, 4100057307, 4100057759 holds spare stock: transfer 7 EA instead of buying — no purchase needed.
Long-leadSingle sourceSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
7
order qty 2
Service level
98.7%
stockout risk now 59%
Unit price
Rp 86.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 48 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 4 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1096B
METHANOL PRESSURE
A2113.90
PX_PIT-1063-22B
PRESSURE
A140.90
PX_PIT-1842A
METHANOL PRESSURE
B100.04
PX_DPT-1725
DIFF. PRESSURE
S100.06

Lead time and procurement

Lead time 134 ± 45 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
21 Sept 2025PR05
Project / turnaround
2Rp 86.1M30 Jul 2026312 d
12 May 2025PR03
Regular replenishment
1Rp 86.4M27 Sept 2025138 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Sept 2026MediumPX_PIT-1096BPIT-1096B reading frozen
11 Aug 2026MediumPX_PIT-1096BAR25/tranmsitter low performance
09 Aug 2026MediumPX_PIT-1096BAR25/tranmsitter low performance
22 Jul 2026LowPX_PIT-1096BRepair insulation PIT-1096B
29 May 2026MediumPX_PIT-1096BPIT-1096B reading frozen
20 Apr 2026MediumPX_PIT-1096BInstall scaffolding at PIT-1096B
14 Apr 2026LowPX_PIT-1063-22BPainting PIT-1063-22B
02 Apr 2026MediumPX_PIT-1063-22BAR25/tranmsitter low performance
15 Jan 2026MediumPX_PIT-1096BReplace lamp as per PM finding
27 Dec 2025HighPX_PIT-1096BInstall scaffolding at PIT-1096B

Recent goods issues

Posting dateQtyOrderOrder type
14 Aug 20262201000026615Corrective
12 Aug 20261201000026615Corrective