TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART
Material 4100057462 · TRANSMITTER · Plant 1000
ALong-leadTransferCriticalStockout
- Material
- 4100057462
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- MEGA TEKNIK MAKMUR PT
- Lead time
- 134 d · P80 126 d
- Unit price
- Rp 86.2M
Recommendation
- 1.Forecast 3.6 EA/year: 3.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~134 days; expected demand during lead time 1.3.
- 3.A 98.7% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 7.
- 4.On hand 0 + on order 0 is at or below the reorder point: 7 needed.
- 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
- 7.Identical part 4100057472, 4100057307, 4100057759 holds spare stock: transfer 7 EA instead of buying — no purchase needed.
Long-leadSingle sourceSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 4
Rec. Max
7
order qty 2
Service level
98.7%
stockout risk now 59%
Unit price
Rp 86.2M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 48 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 4 functional locations
3 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1096B METHANOL PRESSURE | A | 2 | 11 | 3.90 |
| PX_PIT-1063-22B PRESSURE | A | 1 | 4 | 0.90 |
| PX_PIT-1842A METHANOL PRESSURE | B | 1 | 0 | 0.04 |
| PX_DPT-1725 DIFF. PRESSURE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 134 ± 45 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2025 | PR05 Project / turnaround | 2 | Rp 86.1M | 30 Jul 2026 | 312 d |
| 12 May 2025 | PR03 Regular replenishment | 1 | Rp 86.4M | 27 Sept 2025 | 138 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Sept 2026 | Medium | PX_PIT-1096B | PIT-1096B reading frozen |
| 11 Aug 2026 | Medium | PX_PIT-1096B | AR25/tranmsitter low performance |
| 09 Aug 2026 | Medium | PX_PIT-1096B | AR25/tranmsitter low performance |
| 22 Jul 2026 | Low | PX_PIT-1096B | Repair insulation PIT-1096B |
| 29 May 2026 | Medium | PX_PIT-1096B | PIT-1096B reading frozen |
| 20 Apr 2026 | Medium | PX_PIT-1096B | Install scaffolding at PIT-1096B |
| 14 Apr 2026 | Low | PX_PIT-1063-22B | Painting PIT-1063-22B |
| 02 Apr 2026 | Medium | PX_PIT-1063-22B | AR25/tranmsitter low performance |
| 15 Jan 2026 | Medium | PX_PIT-1096B | Replace lamp as per PM finding |
| 27 Dec 2025 | High | PX_PIT-1096B | Install scaffolding at PIT-1096B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Aug 2026 | 2 | 201000026615 | Corrective |
| 12 Aug 2026 | 1 | 201000026615 | Corrective |