TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF

Material 4100057525 · TRANSMITTER · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100057525
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
78 d · P80 126 d
Unit price
Rp 42.8M

Recommendation

  • 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~78 days; expected demand during lead time 0.1.
  • 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 9 other material numbers
On hand / on order
1 / 2
next delivery 09 Jan 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 42.8M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 250 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 507.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1370-14
BFW PRESSURE
A100.04
PX_LIT-657A
LEVEL
B100.03
PX_PIT-1396
PRESSURE
C100.04

Lead time and procurement

Lead time 78 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
20 Sept 2026PR03
Regular replenishment
2Rp 42.3M09 Jan 2027
open
111 d
26 Jun 2025PR06
Regular replenishment
2Rp 43.3M21 Aug 202556 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
24 Jan 20261201000036700Corrective
23 Jan 20261201000030431Corrective