TRANSMITTER,DIFF.PRESS,0~10000MMH2O,FF
Material 4100057525 · TRANSMITTER · Plant 1000
ALong-leadMonitorSlow-moving
- Material
- 4100057525
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 78 d · P80 126 d
- Unit price
- Rp 42.8M
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~78 days; expected demand during lead time 0.1.
- 3.A 99.1% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 9 other material numbers
On hand / on order
1 / 2
next delivery 09 Jan 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.1%
stockout risk now 0%
Unit price
Rp 42.8M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 250 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 507.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-1370-14 BFW PRESSURE | A | 1 | 0 | 0.04 |
| PX_LIT-657A LEVEL | B | 1 | 0 | 0.03 |
| PX_PIT-1396 PRESSURE | C | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 78 ± 45 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 20 Sept 2026 | PR03 Regular replenishment | 2 | Rp 42.3M | 09 Jan 2027 open | 111 d |
| 26 Jun 2025 | PR06 Regular replenishment | 2 | Rp 43.3M | 21 Aug 2025 | 56 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Jan 2026 | 1 | 201000036700 | Corrective |
| 23 Jan 2026 | 1 | 201000030431 | Corrective |