TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART
Material 4100057551 · TRANSMITTER · Plant 1000
CReduceSlow-moving
- Material
- 4100057551
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 5 FuncLocs A/B)
- Supplier
- SINAR INSTRUMEN NUSANTARA PT
- Lead time
- 92 d · P80 126 d
- Unit price
- Rp 87.2M
Recommendation
- 1.Forecast 1.8 EA/year: 1.8 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~92 days; expected demand during lead time 0.5.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 2 exceeds the level to keep (0) by 2.
Convert to Non StockSingle sourceOpen POSame description as 8 other material numbers
On hand / on order
2 / 2
next delivery 06 Jul 2027
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 87.2M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 260 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 3 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 17.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.
Installed on 5 functional locations
0 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-1281A-27A LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-331A PP-1070B LEVEL | C | 1 | 0 | 0.03 |
| PX_LIT-619A LEVEL | C | 1 | 0 | 0.03 |
| PY_TIT-1209 PP-1139B TEMPERATURE | C | 1 | 0 | 0.04 |
| PX_TIT-924D-26B TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 92 ± 45 days (PO history + category, 1 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Apr 2026 | PR03 Regular replenishment | 1 | Rp 84.4M | 15 Sept 2026 | 144 d |
| 10 Sept 2025 | PR05 Project / turnaround | 2 | Rp 90.0M | 06 Jul 2027 open | 664 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jan 2026 | 1 | 201000002462 | Corrective |
| 08 Jan 2026 | 1 | 201000029776 | Corrective |
| 02 Jan 2026 | 1 | 201000011805 | Corrective |
| 02 Jan 2026 | 2 | 201000011805 | Corrective |