TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF

Material 4100058010 · TRANSMITTER · Plant 1000

BTransferCriticalStockout
Material
4100058010
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 2.8 EA/year: 2.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.6.
  • 3.A 99.0% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 5 needed.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
  • 6.Identical part 4100058628, 4100057273, 4100058579 holds spare stock: transfer 5 EA instead of buying — no purchase needed.
Convert to Stock ItemPrice estimatedLead time estimatedSame description as 7 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.0%
stockout risk now 35%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 3 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 417.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 3 functional locations

1 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_DPT-1916A
DIFF. PRESSURE
B141.35
PX_TIT-1681B
TEMPERATURE
C120.47
PX_PIT-1033-1
HE-149A PRESSURE
C310.04

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Sept 2026MediumPX_TIT-1681BPainting TIT-1681B
31 Aug 2026MediumPX_DPT-1916ACheck DPT-1916A.ok
29 Mar 2026MediumPX_DPT-1916ALeak from packing
08 Sept 2025LowPX_DPT-1916ADPT-1916A error
08 Aug 2025MediumPX_TIT-1681BAR25/tranmsitter low performance
23 May 2025LowPX_DPT-1916ARepair insulation DPT-1916A
12 May 2025MediumPX_PIT-1033-1PIT-1033-1 reading frozen

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261201000029668Corrective
18 Feb 20261201000034128Corrective
17 Feb 20262201000034128Corrective