TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF
Material 4100058024 · TRANSMITTER · Plant 1000
AReduceSlow-moving
- Material
- 4100058024
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 3 FuncLocs A/B)
- Supplier
- PERMATA INSTRUMEN INTERNASIONAL PT
- Lead time
- 65 d · P80 73 d
- Unit price
- Rp 24.8M
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~65 days; expected demand during lead time 0.1.
- 3.A 97.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
- 4.Stock 70 exceeds the level to keep (2) by 68.
- 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Single sourceSame description as 9 other material numbers
On hand / on order
70 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
97.5%
stockout risk now 0%
Unit price
Rp 24.8M
PO history
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 423 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 111.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 3 functional locations
2 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-303 BFW FLOW | A | 1 | 0 | 0.04 |
| PY_PIT-1586-16B PROPYLENE PRESSURE | A | 1 | 0 | 0.04 |
| PX_TIT-1570B-57B HE-1855B TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 65 ± 39 days (PO history, 3 PO lines) · on-time 47%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 03 Mar 2026 | PR03 Regular replenishment | 2 | Rp 25.7M | 04 Jun 2026 | 93 d |
| 20 Feb 2026 | PR03 Regular replenishment | 2 | Rp 24.5M | 03 Apr 2026 | 42 d |
| 06 Oct 2025 | PR06 Regular replenishment | 1 | Rp 24.8M | 05 Nov 2025 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Aug 2025 | 2 | 204000023047 | Preventive |