TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF
Material 4100058058 · TRANSMITTER · Plant 1000
CReduceSlow-moving
- Material
- 4100058058
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 0.6 EA/year: 0.6 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.1.
- 3.A 88.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.Stock 2 exceeds the level to keep (1) by 1.
Price estimatedLead time estimatedSame description as 9 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
88.5%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 474 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 9.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.
Installed on 2 functional locations
0 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TIT-173B-42 TEMPERATURE | C | 1 | 3 | 0.90 |
| PX_FIT-1923C PP-416A INLET FLOW | S | 1 | 2 | 0.90 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 02 Jun 2026 | Medium | PX_TIT-173B-42 | TIT-173B-42 abnormal indication |
| 07 Oct 2025 | Low | PX_FIT-1923C | Check FIT-1923C.ok |
| 22 Sept 2025 | Low | PX_TIT-173B-42 | TIT-173B-42 abnormal indication |
| 08 Jul 2025 | Medium | PX_FIT-1923C | Replace lamp as per PM finding |
| 30 May 2025 | Low | PX_TIT-173B-42 | TIT-173B-42 reading frozen |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 14 Jun 2025 | 1 | 201000001542 | Corrective |