TRANSMITTER,DIFF.PRESS,0~5000MMH2O,HART
Material 4100058112 · TRANSMITTER · Plant 1000
BTransferCriticalStockout
- Material
- 4100058112
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 0.3 EA/year: 0.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.1.
- 3.A 95.0% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: 1 needed.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
- 6.Identical part 4100057362 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 5 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.0%
stockout risk now 5%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 221 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 50.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_TIT-256A TEMPERATURE | B | 1 | 1 | 0.04 |
| PX_LIT-710 VD-1859 LEVEL | S | 1 | 0 | 0.03 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 May 2025 | Medium | PX_TIT-256A | Install scaffolding at TIT-256A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 22 Feb 2026 | 1 | 201000036989 | Corrective |