TRANSMITTER,DIFF.PRESS,0~500MMH2O,FF
Material 4100058151 · TRANSMITTER · Plant 1000
ALong-leadMonitorSlow-moving
- Material
- 4100058151
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- BERKAH REFRAKTORI PRATAMA PT
- Lead time
- 108 d · P80 162 d
- Unit price
- Rp 82.3M
Recommendation
- 1.Forecast 0.4 EA/year: 0.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~108 days; expected demand during lead time 0.1.
- 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 162 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 9 other material numbers
On hand / on order
1 / 1
next delivery 15 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.4%
stockout risk now 0%
Unit price
Rp 82.3M
PO history
ML early warning: 9% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 217 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 299.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 2 functional locations
1 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PIT-352 HE-1144C PRESSURE | A | 1 | 1 | 0.47 |
| PX_PIT-1353C CONDENSATE PRESSURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 108 ± 42 days (PO history, 3 PO lines) · on-time 43%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 12 May 2026 | PR01 Import / long-lead | 1 | Rp 81.8M | 15 Nov 2026 open | 187 d |
| 20 Aug 2025 | PR06 Regular replenishment | 2 | Rp 84.2M | 11 Dec 2025 | 113 d |
| 18 Jun 2025 | PR06 Regular replenishment | 1 | Rp 82.3M | 20 Oct 2025 | 124 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2025 | High | PX_PIT-352 | AR25/tranmsitter low performance |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Feb 2026 | 1 | 201000000733 | Corrective |