Sparely
DU

TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF

Material 4100058304 · TRANSMITTER · Plant 1000

CTransferHighStockout
Material
4100058304
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
SINAR INSTRUMEN NUSANTARA PT
Lead time
80 d · P80 126 d
Unit price
Rp 26.5M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~80 days; expected demand during lead time 0.1.
  • 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 1 needed.
  • 5.Identical part 4100057267 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.1%
stockout risk now 5%
Unit price
Rp 26.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 239 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.

Installed on 1 functional locations

0 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-340C
PP-1628A INLET FLOW
C400.04

Lead time and procurement

Lead time 80 ± 45 days (PO history + category, 1 PO lines) · on-time 31%

PR dateTypeQtyUnit priceDeliveryLead time
01 Mar 2026PR06
Regular replenishment
1Rp 26.5M08 Jun 202699 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
04 Feb 20261201000029861Corrective