TRANSMITTER,DIFF.PRESS,0~2500MMH2O,FF
Material 4100058304 · TRANSMITTER · Plant 1000
CTransferHighStockout
- Material
- 4100058304
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 1 FuncLocs A/B)
- Supplier
- SINAR INSTRUMEN NUSANTARA PT
- Lead time
- 80 d · P80 126 d
- Unit price
- Rp 26.5M
Recommendation
- 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~80 days; expected demand during lead time 0.1.
- 3.A 95.1% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
- 4.On hand 0 + on order 0 is at or below the reorder point: 1 needed.
- 5.Identical part 4100057267 holds spare stock: transfer 1 EA instead of buying — no purchase needed.
Single sourceSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
95.1%
stockout risk now 5%
Unit price
Rp 26.5M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 239 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.
Installed on 1 functional locations
0 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-340C PP-1628A INLET FLOW | C | 4 | 0 | 0.04 |
Lead time and procurement
Lead time 80 ± 45 days (PO history + category, 1 PO lines) · on-time 31%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 01 Mar 2026 | PR06 Regular replenishment | 1 | Rp 26.5M | 08 Jun 2026 | 99 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 04 Feb 2026 | 1 | 201000029861 | Corrective |