TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF

Material 4100058579 · TRANSMITTER · Plant 1000

BReduceNon-moving
Material
4100058579
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.0 EA/year: 0.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 11 exceeds the level to keep (0) by 11.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Convert to Non StockPrice estimatedLead time estimatedSame description as 7 other material numbers
On hand / on order
11 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 605,671/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-1374B-9A
TEMPERATURE
B120.04
PX_LIT-1662-9A
HE-1305B LEVEL
S100.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
13 Dec 2025MediumPX_TIT-1374B-9AInstall scaffolding at TIT-1374B-9A
22 May 2025LowPX_TIT-1374B-9ATIT-1374B-9A error

Recent goods issues

Never issued in the 17-month history.