TRANSMITTER,DIFF.PRESS,0~10000MMH2O,HART

Material 4100058618 · TRANSMITTER · Plant 1000

SMonitorNo stock needed
Material
4100058618
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
BERKAH REFRAKTORI PRATAMA PT
Lead time
70 d · P80 126 d
Unit price
Rp 40.1M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~70 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
Single sourceSame description as 8 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 3%
Unit price
Rp 40.1M
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 312 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 435,455/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~37 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1177A-1
FLOW
S100.04

Lead time and procurement

Lead time 70 ± 45 days (PO history + category, 2 PO lines) · on-time 43%

PR dateTypeQtyUnit priceDeliveryLead time
26 Apr 2026PR06
Regular replenishment
1Rp 40.7M29 Jun 202664 d
24 Mar 2026PR06
Regular replenishment
1Rp 39.5M26 May 202663 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
23 Nov 20251204000021668Preventive