TRANSMITTER,DIFF.PRESS,0~5000MMH2O,FF

Material 4100058628 · TRANSMITTER · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100058628
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
75 d · P80 126 d
Unit price
Rp 37.7M

Recommendation

  • 1.Forecast 0.2 EA/year: 0.2 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~75 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen POSame description as 7 other material numbers
On hand / on order
2 / 1
next delivery 08 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 37.7M
PO history
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 488 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 180.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1541
FLOW
A120.47
PX_TIT-1354
TEMPERATURE
C100.04

Lead time and procurement

Lead time 75 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
08 Aug 2026PR03
Regular replenishment
1Rp 36.3M08 Nov 2026
open
92 d
14 Jul 2025PR05
Project / turnaround
1Rp 39.1M14 Sept 202562 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Aug 2025LowPX_FIT-1541Check FIT-1541.ok
28 May 2025LowPX_FIT-1541Check FIT-1541.ok

Recent goods issues

Posting dateQtyOrderOrder type
31 May 20251204000033891Preventive