TRANSMITTER,TEMP,SIZE HK990,INCOLOY

Material 4100058887 · TRANSMITTER · Plant 1000

AReorderCriticalStockout
Material
4100058887
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (12 of 33 FuncLocs A/B)
Supplier
PRIMA SUPLINDO JAYA PT
Lead time
58 d · P80 54 d
Unit price
Rp 29.0M

Recommendation

  • 1.Forecast 4.9 EA/year: 4.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~58 days; expected demand during lead time 0.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 5 now.
  • 5.Installed on 33 FuncLoc(s), 12 of them criticality A/B.
  • 6.ML early warning: 71% probability of demand in the next 90 days.
Proposed purchase requisition
5 EA
Rp 144.9M · order by 01 Oct 2026
Expected arrival ≈ 58 days
ML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 06 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.9%
stockout risk now 18%
Unit price
Rp 29.0M
PO history
ML early warning: 71% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 230 days ago, 8 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 33 functional locations

12 with criticality A/B · 40 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A372.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_PIT-1963B-50
HE-1756B PRESSURE
A110.47
PX_FIT-1842
FLOW
A100.04
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_PIT-1069
PRESSURE
A100.04
PX_TIT-1882B
CL-1578 TEMPERATURE
A100.04
PX_FIT-1693A
FLOW
B110.04
PX_PIT-1914-34B
HE-536 PRESSURE
B110.04
PX_DPT-182D-46
DIFF. PRESSURE
B100.06
PX_FIT-1760-41B
VD-1864 INLET FLOW
B100.04
PX_PIT-206
PP-1984A PRESSURE
B100.04

Lead time and procurement

Lead time 58 ± 20 days (PO history, 5 PO lines) · on-time 32%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2026PR06
Regular replenishment
1Rp 29.7M06 Oct 2026
open
42 d
19 Jun 2026PR10
Other
1Rp 29.7M03 Aug 202645 d
31 May 2026PR06
Regular replenishment
2Rp 28.5M24 Jul 202654 d
23 Mar 2026PR03
Regular replenishment
2Rp 29.0M17 May 202655 d
06 Jun 2025PR06
Regular replenishment
1Rp 27.9M22 Jul 202546 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
13 Feb 20261201000033319Corrective
26 Nov 20251201000011400Corrective
12 Oct 20251201000030790Corrective
19 Aug 20251201000014278Corrective