Sparely
DU

TRANSMITTER,TEMP,SIZE QD248,GRAPHITE

Material 4100058916 · TRANSMITTER · Plant 1000

AReorderCriticalStockout
Material
4100058916
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (15 of 30 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 6.9 EA/year: 6.9 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~74 days; expected demand during lead time 1.4.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 8 now.
  • 5.Installed on 30 FuncLoc(s), 15 of them criticality A/B.
  • 6.ML early warning: 51% probability of demand in the next 90 days.
Proposed purchase requisition
8 EA
Rp 273.1M · order by 01 Oct 2026
Expected arrival ≈ 74 days
ML early warningConvert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 75%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 51% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 25 days ago, 11 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 30 functional locations

15 with criticality A/B · 44 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A272.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_DPT-956-2A
DIFF. PRESSURE
A141.35
PX_PIT-1063-22B
PRESSURE
A140.90
PX_KT-460B
TURBINE FOR KC-460B
A221.96
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_TIT-680-43B
HE-1522 TEMPERATURE
A420.04
PX_TIT-1081
TEMPERATURE
A110.04
PX_DPT-1291-5B
VD-185 DP
A100.06
PX_FIT-1560A
SLOP OIL FLOW
A100.04
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_LIT-1788A-20
VD-899 LEVEL
A100.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
18 Sept 2026MediumPX_PIT-997A-18Replace lamp as per PM finding
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
21 Aug 2026LowPX_DPT-956-2ADPT-956-2A abnormal indication
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A

Recent goods issues

Posting dateQtyOrderOrder type
06 Sept 20261201000022798Corrective
18 Jun 20261201000018305Corrective
29 Jan 20261201000024383Corrective
13 Jan 20261201000017703Corrective
23 Dec 20251201000022133Corrective
27 Oct 20251201000010024Corrective