TRANSMITTER,TEMP,SIZE XH198,INCOLOY

Material 4100058923 · TRANSMITTER · Plant 1000

ALong-leadReorderNormalSlow-moving
Material
4100058923
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (11 of 19 FuncLocs A/B)
Supplier
PRIMA INDUSTRI SENTOSA PT
Lead time
86 d · P80 139 d
Unit price
Rp 8.8M

Recommendation

  • 1.Forecast 7.4 EA/year: 7.4 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~86 days; expected demand during lead time 1.7.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 12.
  • 4.On hand 2 + on order 2 is at or below the reorder point: order 8 now.
  • 5.Long lead time: 80% of deliveries took up to 139 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 19 FuncLoc(s), 11 of them criticality A/B.
Proposed purchase requisition
8 EA
Rp 70.4M · order by 01 Oct 2026
Expected arrival ≈ 86 days
Long-leadConvert to Stock ItemSingle sourceOpen PO
On hand / on order
2 / 2
next delivery 10 Nov 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
12
order qty 4
Service level
99.9%
stockout risk now 11%
Unit price
Rp 8.8M
PO history
ML early warning: 25% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 272 days ago, 3 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 19 functional locations

11 with criticality A/B · 21 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_KT-460B
TURBINE FOR KC-460B
A221.96
PX_FIT-930A-26B
FLOW
A110.47
PX_PIT-1343A
PRESSURE
A110.04
PX_FIT-1992A-33B
PP-1751A INLET FLOW
A100.04
PX_LIT-799C
LEVEL
A100.03
PX_PIT-1311B
PRESSURE
A100.04
PX_TIT-256A
TEMPERATURE
B110.04
PX_FIT-1676A
METHANOL FLOW
B100.04
PX_LIT-1560
KC-372D LEVEL
B100.03
PX_FIT-235D-57A
HE-955C INLET FLOW
C100.04

Lead time and procurement

Lead time 86 ± 60 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
25 Aug 2026PR04
Regular (other)
2Rp 8.9M10 Nov 2026
open
77 d
26 Oct 2025PR05
Project / turnaround
2Rp 8.7M24 Apr 2026180 d
10 May 2025PR06
Regular replenishment
1Rp 8.8M13 Jun 202534 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
11 Jun 2026LowPX_KT-264ALeak from packing
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding
14 May 2026LowPX_KT-397AKT-397A trip test
13 May 2026LowPX_KT-447KT-447 trip test
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447

Recent goods issues

Posting dateQtyOrderOrder type
02 Jan 20262201000013250Corrective
15 Nov 20251201000021456Corrective