TRANSMITTER,TEMP,SIZE YJ742,A182F11
Material 4100058960 · TRANSMITTER · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100058960
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 11 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 5.9 EA/year: 5.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 1.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
- 4.On hand 3 + on order 0 is at or below the reorder point: order 5 now.
- 5.Installed on 11 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 170.7M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 5%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 11 functional locations
4 with criticality A/B · 17 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| UT_LIT-699-53 LEVEL | A | 1 | 1 | 0.03 |
| PX_FIT-290 FLOW | A | 4 | 0 | 0.04 |
| PX_PIT-119 PRESSURE | B | 1 | 0 | 0.04 |
| PX_DPT-724 HE-462C DP | C | 4 | 0 | 0.06 |
| PX_PIT-1210A-55A PRESSURE | C | 1 | 0 | 0.04 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
| PX_FIT-1691A-21 FLOW | S | 1 | 1 | 0.47 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
| PX_KT-875 TURBINE FOR KC-875 | S | 1 | 0 | 1.10 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 26 May 2026 | Low | PX_KT-397A | Follow up after steam upset KT-397A |
| 24 May 2026 | High | PX_KT-383A | KT-383A steam leak at gland |
| 16 May 2026 | Medium | PX_KT-397A | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Jan 2026 | 2 | 201000004631 | Corrective |
| 03 Jan 2026 | 1 | 201000021786 | Corrective |