TRANSMITTER,TEMP,SIZE YJ742,A182F11

Material 4100058960 · TRANSMITTER · Plant 1000

AReorderNormalSlow-moving
Material
4100058960
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 11 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 5.9 EA/year: 5.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 1.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 3 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 11 FuncLoc(s), 4 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 170.7M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
3 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 5
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 5%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 249 days ago, 6 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 11 functional locations

4 with criticality A/B · 17 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-397A
TURBINE FOR KC-397A
A152.81
UT_LIT-699-53
LEVEL
A110.03
PX_FIT-290
FLOW
A400.04
PX_PIT-119
PRESSURE
B100.04
PX_DPT-724
HE-462C DP
C400.06
PX_PIT-1210A-55A
PRESSURE
C100.04
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_FIT-1691A-21
FLOW
S110.47
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
26 May 2026LowPX_KT-397AFollow up after steam upset KT-397A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
16 May 2026MediumPX_KT-397AReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
25 Jan 20262201000004631Corrective
03 Jan 20261201000021786Corrective