TRANSMITTER,TEMP,MODEL BJ883,GRAPHITE
Material 4100058961 · TRANSMITTER · Plant 1000
ALong-leadReorderCriticalStockout
- Material
- 4100058961
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 10 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 68 d · P80 126 d
- Unit price
- Rp 25.9M
Recommendation
- 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~68 days; expected demand during lead time 0.8.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
- 4.On hand 0 + on order 1 is at or below the reorder point: order 7 now.
- 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 6.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 181.5M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 26 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 34%
Unit price
Rp 25.9M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 306 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 10 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_DPT-340C-33 CL-104 DP | A | 1 | 0 | 0.06 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_TIT-302A-59A TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_PIT-1018A VD-855B PRESSURE | C | 2 | 0 | 0.04 |
| PX_PIT-1095A PRESSURE | C | 1 | 0 | 0.04 |
| PX_FIT-1360-17B HE-1261C INLET FLOW | S | 1 | 0 | 0.04 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
| PX_TIT-1497B PP-1939 TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 68 ± 45 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 29 Aug 2026 | PR06 Regular replenishment | 1 | Rp 26.2M | 26 Nov 2026 open | 89 d |
| 17 Aug 2025 | PR06 Regular replenishment | 2 | Rp 25.6M | 15 Sept 2025 | 29 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 20 Jul 2026 | Low | PX_KT-856A | Follow up after steam upset KT-856A |
| 26 Mar 2026 | Medium | PX_KT-856A | KT-856A steam leak at gland |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 20 Nov 2025 | Medium | PX_KT-856A | KT-856A governor valve hunting |
| 16 Nov 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 04 Sept 2025 | Low | PX_KT-856A | Install scaffolding at KT-856A |
| 26 Aug 2025 | Low | PX_KT-856A | Replace lamp as per PM finding |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 09 May 2025 | Medium | PX_KT-856A | PSM25/KT-856A steam leak at gland |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Nov 2025 | 2 | 201000008439 | Corrective |