TRANSMITTER,TEMP,MODEL BJ883,GRAPHITE

Material 4100058961 · TRANSMITTER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100058961
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
68 d · P80 126 d
Unit price
Rp 25.9M

Recommendation

  • 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~68 days; expected demand during lead time 0.8.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 6, order up to 8.
  • 4.On hand 0 + on order 1 is at or below the reorder point: order 7 now.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Proposed purchase requisition
7 EA
Rp 181.5M · order by 01 Oct 2026
Expected arrival ≈ 68 days
Long-leadSingle sourceOpen PO
On hand / on order
0 / 1
next delivery 26 Nov 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
6
safety stock 6
Rec. Max
8
order qty 2
Service level
99.9%
stockout risk now 34%
Unit price
Rp 25.9M
PO history
ML early warning: 28% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 306 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 10 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_DPT-340C-33
CL-104 DP
A100.06
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_TIT-302A-59A
TEMPERATURE
A100.04
PX_PIT-1018A
VD-855B PRESSURE
C200.04
PX_PIT-1095A
PRESSURE
C100.04
PX_FIT-1360-17B
HE-1261C INLET FLOW
S100.04
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_TIT-1497B
PP-1939 TEMPERATURE
S100.04

Lead time and procurement

Lead time 68 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
29 Aug 2026PR06
Regular replenishment
1Rp 26.2M26 Nov 2026
open
89 d
17 Aug 2025PR06
Regular replenishment
2Rp 25.6M15 Sept 202529 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jul 2026LowPX_KT-856AFollow up after steam upset KT-856A
26 Mar 2026MediumPX_KT-856AKT-856A steam leak at gland
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
20 Nov 2025MediumPX_KT-856AKT-856A governor valve hunting
16 Nov 2025LowPX_KT-856AInstall scaffolding at KT-856A
04 Sept 2025LowPX_KT-856AInstall scaffolding at KT-856A
26 Aug 2025LowPX_KT-856AReplace lamp as per PM finding
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
09 May 2025MediumPX_KT-856APSM25/KT-856A steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
29 Nov 20252201000008439Corrective