TRANSMITTER,TEMP,SIZE WG687,GRAPHITE
Material 4100058994 · TRANSMITTER · Plant 1000
ALong-leadMonitorHealthy
- Material
- 4100058994
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (5 of 10 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 82 d · P80 126 d
- Unit price
- Rp 20.0M
Recommendation
- 1.Forecast 2.3 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~82 days; expected demand during lead time 0.5.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
3 / 1
next delivery 22 Dec 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 20.0M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 41 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 10 functional locations
5 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_KT-308B TURBINE FOR KC-308B | A | 1 | 0 | 1.10 |
| PX_LIT-997A LEVEL | A | 1 | 0 | 0.03 |
| PX_TIT-183C VD-557 TEMPERATURE | A | 1 | 0 | 0.04 |
| PX_FIT-1132A PP-577 INLET FLOW | B | 2 | 0 | 0.04 |
| PX_LIT-709C LEVEL | C | 1 | 1 | 0.46 |
| PX_TIT-1354 TEMPERATURE | C | 1 | 0 | 0.04 |
| PX_KT-264A TURBINE FOR KC-264A | S | 1 | 4 | 2.39 |
| PX_FIT-1177A-1 FLOW | S | 1 | 0 | 0.04 |
| PX_TIT-1497B PP-1939 TEMPERATURE | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 82 ± 45 days (PO history + category, 1 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR03 Regular replenishment | 1 | Rp 20.0M | 22 Dec 2026 open | 104 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Jun 2026 | Low | PX_KT-264A | Leak from packing |
| 21 Apr 2026 | Low | PX_KT-264A | Follow up after steam upset KT-264A |
| 12 Dec 2025 | Low | PX_KT-460B | KT-460B governor valve hunting |
| 21 Oct 2025 | Medium | PX_KT-264A | KT-264A governor valve hunting |
| 26 Aug 2025 | Low | PX_LIT-709C | AR25/tranmsitter low performance |
| 27 Jul 2025 | Medium | PX_KT-460B | Follow up after steam upset KT-460B |
| 31 May 2025 | Medium | PX_KT-264A | Install scaffolding at KT-264A |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Aug 2026 | 1 | 204000030403 | Preventive |
| 29 Nov 2025 | 1 | 201000008439 | Corrective |