TRANSMITTER,TEMP,SIZE WG687,GRAPHITE

Material 4100058994 · TRANSMITTER · Plant 1000

ALong-leadMonitorHealthy
Material
4100058994
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 10 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
82 d · P80 126 d
Unit price
Rp 20.0M

Recommendation

  • 1.Forecast 2.3 EA/year: 2.3 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~82 days; expected demand during lead time 0.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 10 FuncLoc(s), 5 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
3 / 1
next delivery 22 Dec 2026
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 0%
Unit price
Rp 20.0M
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 41 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 10 functional locations

5 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_LIT-997A
LEVEL
A100.03
PX_TIT-183C
VD-557 TEMPERATURE
A100.04
PX_FIT-1132A
PP-577 INLET FLOW
B200.04
PX_LIT-709C
LEVEL
C110.46
PX_TIT-1354
TEMPERATURE
C100.04
PX_KT-264A
TURBINE FOR KC-264A
S142.39
PX_FIT-1177A-1
FLOW
S100.04
PX_TIT-1497B
PP-1939 TEMPERATURE
S100.04

Lead time and procurement

Lead time 82 ± 45 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
09 Sept 2026PR03
Regular replenishment
1Rp 20.0M22 Dec 2026
open
104 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Jun 2026LowPX_KT-264ALeak from packing
21 Apr 2026LowPX_KT-264AFollow up after steam upset KT-264A
12 Dec 2025LowPX_KT-460BKT-460B governor valve hunting
21 Oct 2025MediumPX_KT-264AKT-264A governor valve hunting
26 Aug 2025LowPX_LIT-709CAR25/tranmsitter low performance
27 Jul 2025MediumPX_KT-460BFollow up after steam upset KT-460B
31 May 2025MediumPX_KT-264AInstall scaffolding at KT-264A

Recent goods issues

Posting dateQtyOrderOrder type
21 Aug 20261204000030403Preventive
29 Nov 20251201000008439Corrective