TRANSMITTER,TEMP,TYPE CE324,CS

Material 4100059023 · TRANSMITTER · Plant 1000

AReorderNormalSlow-moving
Material
4100059023
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (6 of 13 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 4.5 EA/year: 4.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.9.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 6.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 5 now.
  • 5.Installed on 13 FuncLoc(s), 6 of them criticality A/B.
Proposed purchase requisition
5 EA
Rp 170.7M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
6
order qty 2
Service level
99.8%
stockout risk now 23%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 315 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 13 functional locations

6 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_TIT-302A-59A
TEMPERATURE
A100.04
PX_PIT-1008
CONDENSATE PRESSURE
B120.47
PX_DPT-1355
DIFF. PRESSURE
B100.06
PX_LIT-1560
KC-372D LEVEL
B100.03
PX_PIT-1531
HE-1967C PRESSURE
B100.04
PX_DPT-1063
DIFF. PRESSURE
C100.06
PX_LIT-1746C-25B
CL-1481 LEVEL
C100.03
PX_LIT-475
PP-1665 LEVEL
C100.03
PX_KT-447
TURBINE FOR KC-447
S1136.24
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_KT-624A
TURBINE FOR KC-624A
S232.39

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
01 Sept 2026LowPX_KT-447Replace lamp as per PM finding
15 Jul 2026MediumPX_KT-624A[MSI-B-26-RXR-331/M] Replace line
08 Jul 2026MediumPX_KT-447Replace lamp as per PM finding
13 May 2026LowPX_KT-447KT-447 trip test
19 Apr 2026LowPX_KT-447Follow up after steam upset KT-447
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
30 Mar 2026LowPX_KT-447Leak from packing
28 Mar 2026MediumPX_KT-447Follow up after steam upset KT-447
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
20 Nov 20251201000004964Corrective