TRANSMITTER,TEMP,MODEL ZD117,CS
Material 4100059054 · TRANSMITTER · Plant 1000
ALong-leadMonitorStockout
- Material
- 4100059054
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- BUANA INDUSTRI LESTARI PT
- Lead time
- 74 d · P80 97 d
- Unit price
- Rp 26.2M
Recommendation
- 1.Forecast 0.5 EA/year: 0.5 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.1.
- 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
- 4.Long lead time: 80% of deliveries took up to 97 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 46% probability of demand in the next 90 days.
Long-leadML early warningConvert to Stock ItemSingle sourceOpen PO
On hand / on order
0 / 4
next delivery 01 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.5%
stockout risk now 0%
Unit price
Rp 26.2M
PO history
ML early warning: 46% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 281 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 401.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_LIT-243 LEVEL | A | 1 | 0 | 0.03 |
| PX_PIT-661A-18 FLUSHING OIL PRESSURE | B | 1 | 0 | 0.04 |
| PX_TIT-1414A TEMPERATURE | B | 1 | 0 | 0.04 |
| PX_TIT-734-33A CL-1019 TEMPERATURE | B | 1 | 0 | 0.04 |
| PX_LIT-1188 HE-192B LEVEL | C | 1 | 1 | 0.03 |
| PX_DPT-1725 DIFF. PRESSURE | S | 1 | 0 | 0.06 |
Lead time and procurement
Lead time 74 ± 55 days (PO history, 4 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Aug 2026 | PR03 Regular replenishment | 2 | Rp 24.7M | 01 Oct 2026 open | 49 d |
| 28 May 2026 | PR01 Import / long-lead | 2 | Rp 26.6M | 13 Nov 2026 open | 169 d |
| 13 Jan 2026 | PR06 Regular replenishment | 1 | Rp 26.6M | 28 Feb 2026 | 46 d |
| 23 Sept 2025 | PR06 Regular replenishment | 1 | Rp 25.8M | 26 Oct 2025 | 33 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 May 2025 | Medium | PX_LIT-1188 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 24 Dec 2025 | 1 | 201000029199 | Corrective |
| 05 Sept 2025 | 1 | 201000001030 | Corrective |