TRANSMITTER,TEMP,MODEL OC176,MONEL

Material 4100059089 · TRANSMITTER · Plant 1000

BReorderCriticalStockout
Material
4100059089
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
B (1 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 8.7 EA/year: 8.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 1.8.
  • 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
  • 5.Installed on 7 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 375.5M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
11
order qty 4
Service level
98.2%
stockout risk now 42%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 32 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 528.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 7 functional locations

1 with criticality A/B · 14 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-1738
DILUTION STEAM FLOW
B300.04
PX_PIT-1252
HE-1767 PRESSURE
C400.04
PX_PIT-1774A
PRESSURE
C100.04
PX_KT-383A
TURBINE FOR KC-383A
S173.67
PX_PIT-649A-24B
PRESSURE
S110.04
PX_KT-778A
TURBINE FOR KC-778A
S101.10
PX_LIT-1062-57B
LEVEL
S300.03

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
19 Sept 2026HighPX_KT-383A[MSI-B-26-CWK-358] Permanent repair
16 Sept 2026MediumPX_KT-383AInstall scaffolding at KT-383A
02 Sept 2026LowPX_KT-383AReplace lamp as per PM finding
23 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
19 Aug 2026MediumPX_KT-383AFollow up after steam upset KT-383A
24 May 2026HighPX_KT-383AKT-383A steam leak at gland
23 Jun 2025MediumPX_KT-383AKT-383A governor valve hunting
23 May 2025MediumPX_PIT-649A-24BAR25/tranmsitter low performance

Recent goods issues

Posting dateQtyOrderOrder type
30 Aug 20261201000000286Corrective
24 Jan 20261201000011771Corrective
09 Dec 20251201000023670Corrective
09 Dec 20253201000023670Corrective
09 Dec 20252201000023670Corrective
06 Sept 20251201000005764Corrective
06 Sept 20254201000005764Corrective