TRANSMITTER,TEMP,MODEL OC176,MONEL
Material 4100059089 · TRANSMITTER · Plant 1000
BReorderCriticalStockout
- Material
- 4100059089
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- B (1 of 7 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 8.7 EA/year: 8.7 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 1.8.
- 3.A 98.2% service level gives the lowest holding + downtime-risk cost: reorder at 7, order up to 11.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 11 now.
- 5.Installed on 7 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
11 EA
Rp 375.5M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
7
safety stock 6
Rec. Max
11
order qty 4
Service level
98.2%
stockout risk now 42%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 12% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 32 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 4 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 528.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.
Installed on 7 functional locations
1 with criticality A/B · 14 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-1738 DILUTION STEAM FLOW | B | 3 | 0 | 0.04 |
| PX_PIT-1252 HE-1767 PRESSURE | C | 4 | 0 | 0.04 |
| PX_PIT-1774A PRESSURE | C | 1 | 0 | 0.04 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
| PX_PIT-649A-24B PRESSURE | S | 1 | 1 | 0.04 |
| PX_KT-778A TURBINE FOR KC-778A | S | 1 | 0 | 1.10 |
| PX_LIT-1062-57B LEVEL | S | 3 | 0 | 0.03 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 02 Sept 2026 | Low | PX_KT-383A | Replace lamp as per PM finding |
| 23 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 19 Aug 2026 | Medium | PX_KT-383A | Follow up after steam upset KT-383A |
| 24 May 2026 | High | PX_KT-383A | KT-383A steam leak at gland |
| 23 Jun 2025 | Medium | PX_KT-383A | KT-383A governor valve hunting |
| 23 May 2025 | Medium | PX_PIT-649A-24B | AR25/tranmsitter low performance |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Aug 2026 | 1 | 201000000286 | Corrective |
| 24 Jan 2026 | 1 | 201000011771 | Corrective |
| 09 Dec 2025 | 1 | 201000023670 | Corrective |
| 09 Dec 2025 | 3 | 201000023670 | Corrective |
| 09 Dec 2025 | 2 | 201000023670 | Corrective |
| 06 Sept 2025 | 1 | 201000005764 | Corrective |
| 06 Sept 2025 | 4 | 201000005764 | Corrective |