TRANSMITTER,TEMP,TYPE QP809,GRAPHITE

Material 4100059181 · TRANSMITTER · Plant 1000

AReorderNormalSlow-moving
Material
4100059181
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 1.5 EA/year: 1.5 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~74 days; expected demand during lead time 0.3.
  • 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 1 now.
  • 5.Installed on 6 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
1 EA
Rp 34.1M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
99.6%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 269 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 6 functional locations

2 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_LIT-476
LEVEL
C110.03
PX_DPT-1298
VD-843C DP
C100.06
PX_FIT-1204A-15
WASH WATER FLOW
C100.04
PX_TIT-1562
TEMPERATURE
S120.47

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 Sept 2026HighPX_TIT-1562TIT-1562 error
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
28 May 2025MediumPX_LIT-476PSM25/Replace lamp as per PM finding
15 May 2025LowPX_KT-419APSM25/Leak from packing
05 May 2025MediumPX_TIT-1562TIT-1562 error

Recent goods issues

Posting dateQtyOrderOrder type
05 Jan 20261201000037293Corrective