TRANSMITTER,TEMP,TYPE TN117,A182F11

Material 4100059254 · TRANSMITTER · Plant 1000

AReduceNon-moving
Material
4100059254
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.3 EA/year: 0.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
99.9%
stockout risk now 0%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 10% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 207.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_FIT-1463-25A
GASOLINE FLOW
B120.47
PX_DPT-382C
HE-1603 DP
C110.49
PX_TIT-117A
HE-391 TEMPERATURE
S100.04

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Jun 2026LowPX_FIT-1463-25AReplace lamp as per PM finding
03 Apr 2026MediumPX_KT-419AKT-419A steam leak at gland
17 Mar 2026MediumPX_KT-419AInstall cover plate for MCP cracking
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
20 Nov 2025MediumPX_KT-419ALeak from packing
10 Nov 2025MediumPX_KT-419APainting KT-419A
03 Sept 2025MediumPX_KT-419AFollow up after steam upset KT-419A
25 Jul 2025LowPX_DPT-382C[MSI-B-25-WXX-325] Permanent repair
05 Jun 2025LowPX_FIT-1463-25AInstall scaffolding at FIT-1463-25A
15 May 2025LowPX_KT-419APSM25/Leak from packing

Recent goods issues

Never issued in the 17-month history.