TRANSMITTER,TEMP,MODEL II719,SS304

Material 4100059274 · TRANSMITTER · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100059274
Category
TRANSMITTER
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 5 FuncLocs A/B)
Supplier
BUANA INDUSTRI LESTARI PT
Lead time
109 d · P80 126 d
Unit price
Rp 15.9M

Recommendation

  • 1.Forecast 1.7 EA/year: 1.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~109 days; expected demand during lead time 0.5.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
  • 4.On hand 0 + on order 2 is at or below the reorder point: order 3 now.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
  • 7.ML early warning: 56% probability of demand in the next 90 days.
Proposed purchase requisition
3 EA
Rp 47.6M · order by 01 Oct 2026
Expected arrival ≈ 109 days
Long-leadML early warningSingle sourceOpen PO
On hand / on order
0 / 2
next delivery 18 Dec 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.8%
stockout risk now 1%
Unit price
Rp 15.9M
PO history
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 454 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.3B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

2 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_FIT-194
FLOW
A410.47
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_KT-202
TURBINE FOR KC-202
S142.81
PX_DPT-1723A
PP-604C DP
S110.06
PX_KT-875
TURBINE FOR KC-875
S101.10

Lead time and procurement

Lead time 109 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
31 Aug 2026PR06
Regular replenishment
2Rp 16.0M18 Dec 2026
open
109 d
06 Dec 2025PR04
Regular (other)
1Rp 15.7M08 Jul 2026214 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland
24 Jun 2025LowPX_FIT-194Replace lamp as per PM finding
03 Jun 2025LowPX_DPT-1723AInstall scaffolding at DPT-1723A

Recent goods issues

Posting dateQtyOrderOrder type
04 Jul 20251201000031005Corrective