TRANSMITTER,TEMP,MODEL HI905,CS
Material 4100059301 · TRANSMITTER · Plant 1000
ALong-leadMonitorSlow-moving
- Material
- 4100059301
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (1 of 3 FuncLocs A/B)
- Supplier
- KARYA ENERGI SENTOSA PT
- Lead time
- 139 d · P80 126 d
- Unit price
- Rp 11.6M
Recommendation
- 1.Forecast 5.9 EA/year: 5.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~139 days; expected demand during lead time 2.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 15.
- 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
12 / 2
next delivery 11 Jun 2027
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 10
Rec. Max
15
order qty 3
Service level
99.9%
stockout risk now 0%
Unit price
Rp 11.6M
PO history
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 325 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_DPT-340C-33 CL-104 DP | A | 1 | 0 | 0.06 |
| PX_KT-447 TURBINE FOR KC-447 | S | 1 | 13 | 6.24 |
| PY_LIT-431A KC-891A LEVEL | S | 1 | 0 | 0.03 |
Lead time and procurement
Lead time 139 ± 45 days (PO history + category, 2 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 09 Sept 2026 | PR01 Import / long-lead | 2 | Rp 11.4M | 11 Jun 2027 open | 275 d |
| 14 Jan 2026 | PR06 Regular replenishment | 1 | Rp 11.8M | 30 Jul 2026 | 197 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Sept 2026 | Low | PX_KT-447 | Replace lamp as per PM finding |
| 08 Jul 2026 | Medium | PX_KT-447 | Replace lamp as per PM finding |
| 13 May 2026 | Low | PX_KT-447 | KT-447 trip test |
| 19 Apr 2026 | Low | PX_KT-447 | Follow up after steam upset KT-447 |
| 30 Mar 2026 | Low | PX_KT-447 | Leak from packing |
| 28 Mar 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 14 Mar 2026 | Medium | PX_KT-447 | KT-447 steam leak at gland |
| 14 Jan 2026 | Medium | PX_KT-447 | Follow up after steam upset KT-447 |
| 21 Nov 2025 | Medium | PX_KT-447 | Leak from packing |
| 19 Nov 2025 | Medium | PX_KT-447 | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 10 Nov 2025 | 1 | 201000026092 | Corrective |
| 10 Nov 2025 | 2 | 201000026092 | Corrective |