Sparely
DU

TRANSMITTER,TEMP,SIZE DH566,A105

Material 4100059334 · TRANSMITTER · Plant 1000

AMonitorInsurance gap
Material
4100059334
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 5 FuncLocs A/B)
Supplier
No PO history
Lead time
74 d · P80 126 d
Unit price
Rp 34.1M (est.)

Recommendation

  • 1.Forecast 0.1 EA/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~74 days; expected demand during lead time 0.0.
  • 3.A 97.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 5 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
4 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1
order qty 1
Service level
97.6%
stockout risk now 2%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 15% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 95.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 5 functional locations

3 with criticality A/B · 5 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_LIT-485
LEVEL
A141.75
PX_KT-308B
TURBINE FOR KC-308B
A101.10
PX_LIT-1165
PP-1168D LEVEL
B100.03
PX_FIT-1526D
BFW FLOW
C100.04
PX_TIT-1740
PP-1530 TEMPERATURE
C100.04

Lead time and procurement

Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Aug 2026MediumPY_LIT-485Replace lamp as per PM finding
05 May 2026MediumPY_LIT-485AR25/tranmsitter low performance
29 Nov 2025HighPY_LIT-485AR25/tranmsitter low performance
13 Aug 2025MediumPY_LIT-485Leak from packing

Recent goods issues

Never issued in the 17-month history.