Sparely
DU

TRANSMITTER,TEMP,SIZE KN129,MONEL

Material 4100059575 · TRANSMITTER · Plant 1000

AMaintainHealthy
Material
4100059575
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 3 FuncLocs A/B)
Supplier
SURYA ENERGI JAYA PT
Lead time
59 d · P80 59 d
Unit price
Rp 10.0M

Recommendation

  • 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~59 days; expected demand during lead time 0.3.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
  • 4.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Single sourceOpen PO
On hand / on order
4 / 2
next delivery 05 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.4%
stockout risk now 0%
Unit price
Rp 10.0M
PO history
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 62 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 556.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1063-22B
PRESSURE
A140.90
PX_PIT-639
PRESSURE
C100.04
PX_TIT-1157
TEMPERATURE
S100.04

Lead time and procurement

Lead time 59 ± 36 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2026PR06
Regular replenishment
2Rp 10.2M05 Oct 2026
open
73 d
26 May 2026PR03
Regular replenishment
1Rp 10.0M03 Jul 202638 d
20 Jun 2025PR03
Regular replenishment
2Rp 10.0M10 Jul 202520 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
14 Apr 2026LowPX_PIT-1063-22BPainting PIT-1063-22B
02 Apr 2026MediumPX_PIT-1063-22BAR25/tranmsitter low performance
11 Oct 2025LowPX_PIT-1063-22BAR25/tranmsitter low performance
20 May 2025LowPX_PIT-1063-22BInstall cover plate for MCP cracking

Recent goods issues

Posting dateQtyOrderOrder type
31 Jul 20261204000016683Preventive
31 Jul 20262204000016683Preventive