Sparely
DU

TRANSMITTER,TEMP,SIZE OQ385,MONEL

Material 4100059790 · TRANSMITTER · Plant 1000

ALong-leadMonitorSlow-moving
Material
4100059790
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
77 d · P80 126 d
Unit price
Rp 10.3M

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~77 days; expected demand during lead time 0.2.
  • 3.A 99.4% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 4.
  • 4.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Long-leadSingle sourceOpen PO
On hand / on order
1 / 2
next delivery 18 Oct 2026
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
4
order qty 2
Service level
99.4%
stockout risk now 1%
Unit price
Rp 10.3M
PO history
ML early warning: 14% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 486 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 417.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KT-513
TURBINE FOR KC-513
A121.53
PX_LIT-722
HE-1660A LEVEL
A110.03

Lead time and procurement

Lead time 77 ± 45 days (PO history + category, 2 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
08 Aug 2026PR03
Regular replenishment
2Rp 10.4M18 Oct 2026
open
71 d
06 Jan 2026PR03
Regular replenishment
1Rp 10.3M08 Apr 202692 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Jan 2026MediumPX_KT-513KT-513 governor valve hunting
29 May 2025MediumPX_LIT-722AR25/tranmsitter low performance
03 May 2025MediumPX_KT-513KT-513 governor valve hunting

Recent goods issues

Posting dateQtyOrderOrder type
02 Jun 20252201000012295Corrective