TRANSMITTER,TEMP,TYPE XP405,PTFE
Material 4100059992 · TRANSMITTER · Plant 1000
AReorderNormalSlow-moving
- Material
- 4100059992
- Category
- TRANSMITTER
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 74 d · P80 126 d
- Unit price
- Rp 34.1M (est.)
Recommendation
- 1.Forecast 2.1 EA/year: 2.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~74 days; expected demand during lead time 0.4.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 5.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
4 EA
Rp 136.6M · order by 01 Oct 2026
Expected arrival ≈ 74 days
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
5
order qty 2
Service level
99.7%
stockout risk now 25%
Unit price
Rp 34.1M
Category + unit estimate
ML early warning: 5% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 319 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~37 days.
Installed on 4 functional locations
3 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KT-419A TURBINE FOR KC-419A | A | 1 | 6 | 2.81 |
| PY_LIT-485 LEVEL | A | 1 | 4 | 1.75 |
| PX_TIT-499C-42A TEMPERATURE | B | 1 | 0 | 0.04 |
| PX_FIT-1629-13A FLOW | S | 1 | 0 | 0.04 |
Lead time and procurement
Lead time 74 ± 45 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Aug 2026 | Medium | PY_LIT-485 | Replace lamp as per PM finding |
| 05 May 2026 | Medium | PY_LIT-485 | AR25/tranmsitter low performance |
| 03 Apr 2026 | Medium | PX_KT-419A | KT-419A steam leak at gland |
| 17 Mar 2026 | Medium | PX_KT-419A | Install cover plate for MCP cracking |
| 29 Nov 2025 | High | PY_LIT-485 | AR25/tranmsitter low performance |
| 20 Nov 2025 | Medium | PX_KT-419A | Leak from packing |
| 10 Nov 2025 | Medium | PX_KT-419A | Painting KT-419A |
| 03 Sept 2025 | Medium | PX_KT-419A | Follow up after steam upset KT-419A |
| 13 Aug 2025 | Medium | PY_LIT-485 | Leak from packing |
| 15 May 2025 | Low | PX_KT-419A | PSM25/Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 16 Nov 2025 | 2 | 201000026377 | Corrective |
| 07 Aug 2025 | 1 | 201000016556 | Corrective |