TRANSMITTER,TEMP,SIZE YT593,GRAPHITE

Material 4100060304 · TRANSMITTER · Plant 1000

CReduceExcess
Material
4100060304
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 2 FuncLocs A/B)
Supplier
SINAR SEJAHTERA LESTARI PT
Lead time
65 d · P80 126 d
Unit price
Rp 16.0M

Recommendation

  • 1.Forecast 1.1 EA/year: 1.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~65 days; expected demand during lead time 0.2.
  • 3.A 81.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2.
  • 4.Stock 76 exceeds the level to keep (2) by 74.
Single source
On hand / on order
76 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2
order qty 2
Service level
81.6%
stockout risk now 0%
Unit price
Rp 16.0M
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 135 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~37 days.

Installed on 2 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_TIT-1120A-33A
TEMPERATURE
C210.04
PX_KT-202
TURBINE FOR KC-202
S142.81

Lead time and procurement

Lead time 65 ± 45 days (PO history + category, 1 PO lines) · on-time 33%

PR dateTypeQtyUnit priceDeliveryLead time
09 May 2026PR03
Regular replenishment
2Rp 16.0M16 Jun 202638 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
18 Sept 2026MediumPX_KT-202Repair insulation KT-202
09 Jan 2026MediumPX_KT-202KT-202 governor valve hunting
17 Sept 2025MediumPX_KT-202Replace lamp as per PM finding
14 Jul 2025MediumPX_TIT-1120A-33APainting TIT-1120A-33A
06 Jul 2025LowPX_KT-202KT-202 steam leak at gland

Recent goods issues

Posting dateQtyOrderOrder type
19 May 20261201000006755Corrective