TRANSMITTER,TEMP,TYPE SN564,INCOLOY

Material 4100060681 · TRANSMITTER · Plant 1000

BLong-leadReduceSlow-moving
Material
4100060681
Category
TRANSMITTER
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
LANGIT SEJAHTERA PRATAMA PT
Lead time
87 d · P80 126 d
Unit price
Rp 21.2M

Recommendation

  • 1.Forecast 0.7 EA/year: 0.7 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~87 days; expected demand during lead time 0.2.
  • 3.A 98.9% service level gives the lowest holding + downtime-risk cost: reorder at 1, order up to 2.
  • 4.Stock 5 exceeds the level to keep (2) by 3.
  • 5.Long lead time: 80% of deliveries took up to 126 days and the fastest seen in its category 37 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Long-leadSingle source
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
1
safety stock 1
Rec. Max
2
order qty 1
Service level
98.9%
stockout risk now 0%
Unit price
Rp 21.2M
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 240 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 129.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~37 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1080
PP-248B PRESSURE
B100.04

Lead time and procurement

Lead time 87 ± 45 days (PO history + category, 1 PO lines) · on-time 40%

PR dateTypeQtyUnit priceDeliveryLead time
24 Jul 2025PR03
Regular replenishment
2Rp 21.2M28 Nov 2025127 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
03 Feb 20261201000009533Corrective
02 Feb 20261201000009533Corrective