THERMOCOUPLE,J-1ELMNT,6.4X1600LG

Material 4100060761 · THERMOCOUPLE · Plant 1000

AReorderCriticalStockout
Material
4100060761
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (17 of 33 FuncLocs A/B)
Supplier
SURYA ENERGI JAYA PT
Lead time
49 d · P80 46 d
Unit price
Rp 5.0M

Recommendation

  • 1.Forecast 38 EA/year: 38 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~49 days; expected demand during lead time 5.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 29.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 29 now.
  • 5.Installed on 33 FuncLoc(s), 17 of them criticality A/B.
  • 6.ML early warning: 70% probability of demand in the next 90 days.
Proposed purchase requisition
29 EA
Rp 145.7M · order by 01 Oct 2026
Expected arrival ≈ 49 days
ML early warningSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 13
Rec. Max
29
order qty 11
Service level
99.9%
stockout risk now 90%
Unit price
Rp 5.0M
PO history
ML early warning: 70% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 165 days ago, 92 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 13.8B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 33 functional locations

17 with criticality A/B · 39 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A111442.86
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-102
CRACKING FURNACE BF-102
A17128.72
PX_BF-103
CRACKING FURNACE BF-103
A13814.58
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_KT-856A
TURBINE FOR KC-856A
A172.81
PX_KT-419A
TURBINE FOR KC-419A
A162.81
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_BF-109-QF01
BURNER BF-109
A421.30
PX_KT-460B
TURBINE FOR KC-460B
A121.96
PX_KT-513
TURBINE FOR KC-513
A121.53

Lead time and procurement

Lead time 49 ± 22 days (PO history, 3 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
05 Apr 2026PR03
Regular replenishment
3Rp 5.1M10 May 202635 d
13 Oct 2025PR06
Regular replenishment
3Rp 5.0M03 Dec 202551 d
13 Sept 2025PR03
Regular replenishment
2Rp 5.0M21 Oct 202538 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026LowPX_BF-103Leak from packing
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
28 Sept 2026LowPX_BF-106Peep door broken BF-106
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026HighPX_BF-108Leak from packing
23 Sept 2026LowPX_BF-102Replace burner tip BF-102
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-103Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
19 Apr 20261201000004192Corrective
13 Dec 20253201000008016Corrective
18 Nov 20251201000002039Corrective
12 Nov 20252201000025202Corrective
28 May 20251201000028245Corrective