Sparely
DU

THERMOCOUPLE,N-1ELMNT,3.2X3700LG

Material 4100060792 · THERMOCOUPLE · Plant 1000

AReorderCriticalBelow reorder point
Material
4100060792
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (20 of 30 FuncLocs A/B)
Supplier
PERMATA INSTRUMEN INTERNASIONAL PT
Lead time
50 d · P80 56 d
Unit price
Rp 3.3M

Recommendation

  • 1.Forecast 30 EA/year: 30 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~50 days; expected demand during lead time 4.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 15, order up to 27.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 25 now.
  • 5.Installed on 30 FuncLoc(s), 20 of them criticality A/B.
  • 6.ML early warning: 62% probability of demand in the next 90 days.
Proposed purchase requisition
25 EA
Rp 82.8M · order by 01 Oct 2026
Expected arrival ≈ 50 days
ML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
15
safety stock 11
Rec. Max
27
order qty 12
Service level
100.0%
stockout risk now 72%
Unit price
Rp 3.3M
PO history
ML early warning: 62% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 2 issue days in the last 180 days, last issue 56 days ago, 65 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 10.7B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 30 functional locations

20 with criticality A/B · 36 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-105
CRACKING FURNACE BF-105
A311442.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-104
CRACKING FURNACE BF-104
A12811.58
PX_BF-107
CRACKING FURNACE BF-107
A1239.01
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_TEL-1385
TEMPERATURE
A110.01
PX_TEL-387
PP-563 OUTLET
A110.44
PX_BF-111-BRN10
BURNER BF-111
A200.45
PX_TEL-1166B-37
CRACKED GAS OUTLET BF-112
A400.01
PX_TEL-1767A
VD-1062B OUTLET
A100.01
PX_TEL-1996
TEMPERATURE
A100.01

Lead time and procurement

Lead time 50 ± 21 days (PO history, 7 PO lines) · on-time 47%

PR dateTypeQtyUnit priceDeliveryLead time
30 Jun 2026PR03
Regular replenishment
3Rp 3.2M19 Aug 202650 d
13 Jun 2026PR06
Regular replenishment
2Rp 3.4M30 Jul 202647 d
15 Mar 2026PR06
Regular replenishment
5Rp 3.1M11 Apr 202627 d
21 Nov 2025PR03
Regular replenishment
3Rp 3.3M28 Jan 202668 d
11 Nov 2025PR06
Regular replenishment
4Rp 3.2M07 Jan 202657 d
26 Sept 2025PR03
Regular replenishment
5Rp 3.3M24 Oct 202528 d
04 Sept 2025PR03
Regular replenishment
1Rp 3.3M28 Oct 202554 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026HighPX_BF-105Repair refractory crack BF-105
29 Sept 2026LowPX_BF-112Painting BF-112
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
25 Sept 2026MediumPX_BF-108Repair refractory crack BF-108
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
24 Sept 2026HighPX_BF-108Leak from packing
21 Sept 2026MediumPX_BF-104Cleaning burner BF-104
20 Sept 2026MediumPX_BF-105Replace lamp as per PM finding
20 Sept 2026MediumPX_BF-105Install scaffolding at BF-105

Recent goods issues

Posting dateQtyOrderOrder type
06 Aug 20261201000005043Corrective
04 Jul 20262201000027253Corrective
18 Jan 20261201000026755Corrective
18 Oct 20251201000002220Corrective
18 Oct 20252201000002220Corrective
14 Sept 20251201000004760Corrective