THERMOCOUPLE,J-2ELMNT,8X3800LG
Material 4100060821 · THERMOCOUPLE · Plant 1000
AReduceSlow-moving
- Material
- 4100060821
- Category
- THERMOCOUPLE
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (6 of 13 FuncLocs A/B)
- Supplier
- SURYA ENERGI JAYA PT
- Lead time
- 39 d · P80 30 d
- Unit price
- Rp 6.1M
Recommendation
- 1.Forecast 51 EA/year: 51 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~39 days; expected demand during lead time 5.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 25, order up to 37.
- 4.Stock 42 exceeds the level to keep (37) by 5.
- 5.Installed on 13 FuncLoc(s), 6 of them criticality A/B.
- 6.ML early warning: 57% probability of demand in the next 90 days.
ML early warningSingle sourceOpen PO
On hand / on order
42 / 1
next delivery 14 Oct 2026
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
25
safety stock 20
Rec. Max
37
order qty 12
Service level
99.9%
stockout risk now 0%
Unit price
Rp 6.1M
PO history
ML early warning: 57% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 299 days ago, 26 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.
Installed on 13 functional locations
6 with criticality A/B · 17 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_BF-106 CRACKING FURNACE BF-106 | A | 1 | 82 | 30.86 |
| PX_KT-856A TURBINE FOR KC-856A | A | 1 | 7 | 2.81 |
| PX_KT-397A TURBINE FOR KC-397A | A | 1 | 5 | 2.81 |
| PX_KT-460B TURBINE FOR KC-460B | A | 1 | 2 | 1.96 |
| PX_TEL-1915 TEMPERATURE | A | 1 | 0 | 0.01 |
| PX_TEL-1540 TEMPERATURE | B | 2 | 0 | 0.01 |
| PY_TEL-551 CRACKED GAS OUTLET BF-111 | C | 1 | 1 | 0.01 |
| PX_BF-101-QF04 PEEP DOOR | C | 1 | 0 | 0.45 |
| PX_BF-110-PD11 DILUTION STEAM TO MIXED FEED COIL | C | 4 | 0 | 0.45 |
| PX_TEL-1539A-32A HE-526A OUTLET | C | 1 | 0 | 0.01 |
| PX_TEL-908B TEMPERATURE | C | 1 | 0 | 0.01 |
| PX_KT-383A TURBINE FOR KC-383A | S | 1 | 7 | 3.67 |
Lead time and procurement
Lead time 39 ± 21 days (PO history, 4 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 21 Sept 2026 | PR06 Regular replenishment | 1 | Rp 6.1M | 14 Oct 2026 open | 23 d |
| 08 Aug 2026 | PR06 Regular replenishment | 2 | Rp 6.1M | 27 Aug 2026 | 19 d |
| 09 Jun 2026 | PR06 Regular replenishment | 3 | Rp 5.9M | 01 Jul 2026 | 22 d |
| 22 Sept 2025 | PR03 Regular replenishment | 3 | Rp 6.5M | 02 Nov 2025 | 41 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 29 Sept 2026 | Medium | PX_BF-106 | Decoking follow up BF-106 |
| 28 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 19 Sept 2026 | Medium | PX_BF-106 | Cleaning burner BF-106 |
| 19 Sept 2026 | High | PX_KT-383A | [MSI-B-26-CWK-358] Permanent repair |
| 16 Sept 2026 | Medium | PX_KT-383A | Install scaffolding at KT-383A |
| 15 Sept 2026 | Medium | PX_BF-106 | Install cover plate BF-106 |
| 14 Sept 2026 | Low | PX_BF-106 | Peep door broken BF-106 |
| 10 Sept 2026 | Medium | PX_BF-106 | Replace burner tip BF-106 |
| 08 Sept 2026 | Low | PX_BF-106 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Dec 2025 | 4 | 201000006166 | Corrective |
| 06 Dec 2025 | 1 | 201000006166 | Corrective |
| 06 Dec 2025 | 2 | 201000006166 | Corrective |
| 05 Dec 2025 | 1 | 201000006166 | Corrective |
| 05 Dec 2025 | 2 | 201000006166 | Corrective |