THERMOCOUPLE,J-1ELMNT,6.4X3300LG

Material 4100060825 · THERMOCOUPLE · Plant 1000

ALong-leadReorderCriticalStockout
Material
4100060825
Category
THERMOCOUPLE
Base unit
EA
MRP type
Stock Item
Criticality
A (7 of 16 FuncLocs A/B)
Supplier
KARYA ENERGI SENTOSA PT
Lead time
53 d · P80 98 d
Unit price
Rp 3.4M

Recommendation

  • 1.Forecast 31 EA/year: 31 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~53 days; expected demand during lead time 4.5.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 18, order up to 30.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 30 now.
  • 5.Long lead time: 80% of deliveries took up to 98 days and the fastest seen in its category 27 days, from a single supplier. Emergency buying cannot prevent downtime: plan ahead or hold as a capital spare.
  • 6.Installed on 16 FuncLoc(s), 7 of them criticality A/B.
Proposed purchase requisition
30 EA
Rp 102.4M · order by 01 Oct 2026
Expected arrival ≈ 53 days
Long-leadSingle source
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
18
safety stock 14
Rec. Max
30
order qty 12
Service level
100.0%
stockout risk now 87%
Unit price
Rp 3.4M
PO history
ML early warning: 20% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 269 days ago, 49 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 12.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~27 days.

Installed on 16 functional locations

7 with criticality A/B · 18 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_BF-106
CRACKING FURNACE BF-106
A18230.86
PX_BF-112
CRACKING FURNACE BF-112
A17327.01
PX_BF-109
CRACKING FURNACE BF-109
A12911.58
PX_BF-107
CRACKING FURNACE BF-107
A2239.01
PX_BF-111
CRACKING FURNACE BF-111
A1239.01
PX_KT-397A
TURBINE FOR KC-397A
A152.81
PX_BF-109-PD09
CONVECTION SECTION
B100.45
PX_BF-104-DUCT35
BURNER BF-104
C120.87
PX_BF-101-COIL23
BURNER BF-101
C100.45
PX_TEL-1299A
TEMPERATURE
C100.01
PX_TEL-1329
HE-1675 BTM
C100.01
PX_TEL-236
KC-593C OUTLET
C200.01

Lead time and procurement

Lead time 53 ± 36 days (PO history + category, 1 PO lines) · on-time 38%

PR dateTypeQtyUnit priceDeliveryLead time
18 Feb 2026PR03
Regular replenishment
2Rp 3.4M31 Mar 202641 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Sept 2026MediumPX_BF-112Install cover plate BF-112
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026MediumPX_BF-106Decoking follow up BF-106
29 Sept 2026LowPX_BF-112Painting BF-112
28 Sept 2026LowPX_BF-106Peep door broken BF-106
27 Sept 2026MediumPX_BF-112Repair insulation BF-112
24 Sept 2026LowPX_BF-107Install scaffolding at BF-107
22 Sept 2026MediumPX_BF-111Install cover plate BF-111
20 Sept 2026MediumPX_BF-109Thermograph wall BF-109
19 Sept 2026MediumPX_BF-106Cleaning burner BF-106

Recent goods issues

Posting dateQtyOrderOrder type
05 Jan 20262201000039015Corrective
15 Jul 20251201000009125Corrective